How Long Does It Take To Fit A Kitchen

Homeowners often ask us: How long does it take to fit a kitchen? Generally, a kitchen fitting takes an average of 10 working days (two full weeks). However, the installation duration varies depending on the kitchen size, work scopes, layout, number of appliances, etc.

A kitchen renovation not only restores an inviting ambiance but also boosts your property value. Three major steps of kitchen installation are: choosing a perfect design, identifying the best quote, and hiring reliable kitchen fitters. A simple yet modernised and sturdy, vibrant kitchen is all that your heart may desire.

How Long Does it Take to Fit a Kitchen – With Installation Steps

Regardless of whether it is a small or a bespoke large kitchen, don’t forget to ask your kitchen fitter how long the project may take. The timeframe runs by its own rules. The more complex or labor-intensive the work required, the longer the kitchen installation will take.

Let’s delve into the timeframe details for each step of kitchen fitting:

Pre-planning and design selection: 1-2 weeks

Benjamin Franklin said, ” If you fail to plan, you are planning to fail.” Whether you make changes in layout or material, planning is the key to a seamless execution.

Your kitchen fitter must have extensive knowledge of the kitchen to assist in planning. In two weeks, you can plan everything from design selection to setting the budget.

If you’re in a hurry, give yourself at least one week to plan how you want everything to happen. Pinterest displays outstanding layouts and kitchen designs that are available for all kitchen sizes.

Pre-visiting by kitchen fitters: 1 day

Before installation, kitchen fitters visit the kitchen and observe the requirements. Once the inspection is done, they might discuss the execution process, requirements, and share suggestions on layouts or equipment.

While visiting, kitchen fitters check wiring, electric ports, plumbing work, etc., and measure everything.

Ordering appliances and waiting for delivery: 2-4 weeks

List down the appliances you want in your kitchen. Now, consult your kitchen fitter about the appliances and share suggestions. Visit a couple of shops, buy them yourself, or order online. Delivery can take 2-4 weeks or more.

Removing the old kitchen: 1-2 days

Old appliances must be removed from the kitchen. Typically, professionals remove them as part of their project. However, they won’t remove everything from your kitchen.

You should remove the dishes, utensils, cutlery sets, etc, from the kitchen before the fitters arrive.

First fix in the kitchen: 2-3 days

First fix means ground works such as plumbing, underfloor heating installation, pipework, electric work, etc., which you require before setting the floor.

First fix requires plumbers, electricians, and gas engineers. Installation time varies based on the working scope and complexity.

Wall setting & plastering: 3-4 days

If the walls have any signs of cracks or holes, it is the perfect time to refit them. Plastering kitchen walls is nearly mandatory. It reinforces walls, makes them stable, and smoothens the wall surface. Plastering also protects the wall structure from moisture damage.

Tiling, painting, wallpapering, etc., will not be smooth without a well-plastered wall. Usually it takes 3-4 days. However, plastering may take up to 5 days or more to dry in excessive humidity.

Floor setting: 2-5 days

Kitchen floors must be durable and water-resistant, as they withstand a medium to high foot traffic every day. LVT (Luxurious Vinyl tiles), porcelain tiles, ceramic tiles, etc, are waterproof and perfect for kitchen flooring.

Ensure your kitchen fitters are adding high-quality adhesive and sealants in tile gaps.

Appliance fitting: 3-5 days (basic) & 2 weeks or more (customised)

Kitchen appliances(cabinets, sink, worktop, backsplash, kitchen chimney(if required), etc.) must be installed by professional kitchen fitters to perfection.

To adjust the sink’s hot water and cold water connections, and the hob, you’ll need professional plumbing services. Worktops must be cut down to size in the shop and set accordingly. Heavy worktops can lengthen the installation time.

Time for second fix: 1-2 days

The second fix involves connecting kitchen fixtures, such as taps, fitting doors, cabinet handles, etc. It also includes installing kitchen light fittings, sockets, switches, hobs, etc. You must hire plumbers and electricians to connect these detailed fixtures.

Decorating the kitchen: 2-3 days

Decorating your kitchen with tiling and painting can be customized based on a theme. Painting is an option here.

However, tiling guards the kitchen wall, gives it a smooth finish, and prevents moisture locking. Keeping natural plants or fresh flowers in vases increases the kitchen’s vibrance.

Finishing touch & checking: 1-2 days

Once all processes are complete, the kitchen fitters check for any leftover work and if any repair is required. It takes typically 1-2 days. After proper checking, the kitchen fitter handovers the project successfully.

What Can Affect a Kitchen Installation Time?

Structural changes, heavy materials, customised designs, etc, can severely affect a kitchen installation time. However, many other factors can lengthen the duration of kitchen fitting. Let’s shed light on those factors:

Kitchen size

A small kitchen certainly takes less installation time than a large bespoke one. However, the duration of a kitchen fitting also depends on the kitchen materials.

For example, a small kitchen customised with heavy appliances can take more time than a large yet simple kitchen renovation.

Unexpected delays

Some unexpected issues can arise suddenly when installing a new kitchen, such as hidden leaks or faulty wiring.

Sometimes, there can be an inspection in case of relocation to check if you followed the local guidelines and building regulations. That inspection can delay your kitchen installation time.

Changing the layout

Keeping the same layout in your new kitchen takes a short time. However, changing the layout or choosing a curved design requires more time.

The new layout can be galley, L-shape, U-shape, open-plan, peninsula, single wall, or kitchen with an island.

Material type

Choosing heavy materials such as natural stones for the worktop can lengthen the installation time.

Templating the worktop, cutting granites or marbles in the right proportion, and installing them properly requires precision and time.

Scope of work

Adding more cabinets, installing new features, rewiring, relocating pipework, etc., can extend your kitchen fitting time. The more appliances or features you add, the more time it’ll take.

Current condition of the kitchen

Renovating a kitchen can take a lot of time when its current condition is poor. Old cabinets, cracks in the wall, damaged pipework, etc., can take additional time beyond the estimation.

Kitchen Fitting Time: New Installation Vs Renovation

A new kitchen installation likely takes less time than a renovation. Both types of fittings allow you to customise your kitchen. Installing a new kitchen means a like-for-like replacement, whereas renovation involves removing the old design and upgrading the kitchen.

New Kitchen Installation Time — A new kitchen typically takes 2-3 weeks to install. However, due to heavy materials and additional features, it may take 1-2 weeks more.

Renovation Time — A kitchen renovation involves a ton of work. From ripping out the old kitchen to upgrading, it may take 4/5 weeks to a few months.

Usually, a new installation is a straightforward kitchen fitting. But when upgrading, you may change the layout, relocate wiring/gas line, add new features, or face unexpected delays, which cost more time.

How much does it cost to fit a kitchen?

Kitchen fitting usually takes 2 weeks or may take a couple of months, depending on many underlying factors. However, budgeting the cost of the kitchen fitting is important. Costs may vary depending on the condition and process.

Here is an approximate kitchen fitting cost according to Checkatrade:

Fitting TypeUnitAverage Cost
Cabinet fittingPer unit/per cabinet£120
Worktop fittingPer job£500
Sink installationPer job£100
PlasteringPer roomStarts from £1100
Painting(Labour only)Per Day£325
Tiling(Labour only)Per Day£300
PlumberPer hour£50
ElectricianPer hour£55
Underfloor HeatingPer m²£95-£110(wet system)£60-£85 (electric system)

Can I replace my kitchen myself?

DIY kitchen replacement is possible if you know how to replace it correctly and have the proper tools. However, you may need plumbers and electricians to do some specific fittings. Some fittings are not allowed to be done without Gas Safe-registered experts. You can’t do them yourself.

Generally, we don’t recommend fitting a kitchen yourself. Instead, you can remove old equipment yourself, paint, and decorate the kitchen to reduce labour costs. Hiring professionals is a wise decision when fitting a kitchen. A DIY fitting can leave leaks, leading to further repairs and additional expenses.

Final Words

Kitchen fittings must be done correctly to avoid further complications. However, a lengthy installation time might affect the budget. That’s why you should hire professionals who offer fast, seamless renovation, repair, and upgrade services.

An old, malfunctioning kitchen is nothing but a distress. Now that you know how long does it take to fit a kitchen, plan for a skillful kitchen fitting. Upgrade your kitchen to enjoy the modernistic layout and welcoming ambience.

Frequently Asked Questions (FAQs) on How Long Does it Take to Fit a Kitchen

Can you replace a kitchen floor without removing cabinets?

Yes, kitchen floors can be replaced carefully without removing cabinets. It takes time and requires trained professionals. The kickboards must be cut down with expert hands, and the new flooring appliances fitted underneath.

How long does plaster take to dry before fitting a kitchen?

Kitchen plaster should be dried naturally, which may take 3-5 days. Excessive humidity or heat can cause unexpected issues. Keep the windows open and turn on a fan to ensure seamless airflow.

How much does a fitter charge to fit a kitchen?

According to Checkatrade, a kitchen fitter usually charges an average of £300 per day. However, the range can fluctuate depending on the time of year, location, accessibility, etc.

Can a kitchen be fitted in a day?

Kitchen installation requires proper planning and expert labour. Depending on the scope of the work and the current condition, it can take a few weeks. It can’t be done overnight.

How long should it take to install a kitchen?

A kitchen installation usually takes 2 full weeks. The installation time can extend depending on fitting complexities.

Do kitchen fitters remove old kitchens?

Yes, kitchen fitters remove old kitchens before installing the new one. Old equipment removal is included in their installation package.

How long do fitted kitchens last?

If installed properly, fitted kitchens last up to 20 years. With proper maintenance, a kitchen fitting remains stylish and usable for 10-15 years.